Preparation of a hall for the protected material excavated from the contaminated soil.

Excavated material with varying levels of contamination.

Looking into the marquee.

Conveyor belt for transporting contaminated soil to the transport vessel.

Installation for loading the excavated soil onto the vessel.

Containers with activated carbon filter.

Preparation of loaded and washed containers (gross weight of 50 tonnes per unit) for loading.

Exhaust air cleaning and monitoring system – fitted with a gas chromatograph – that alerts the 24-hour on-call service if the limits are exceeded.

Highly complex, and therefore time-consuming, process to load 6,000 tonnes of contaminated soil for each shipment.